chiaha-SLXFor classes · Materials

chiaha-SLX Lab 4: A machine that breaks down

Time: 40–50 minutes
You need: a browser and a chiaha-SLX sign-in.
Open it: https://slx.chiaha.com/slx?open=deck/breakdowns

Learning goals

The problem

Jobs come to one machine every 10 ± 3 minutes and take 8 ± 2 minutes of work (both spread evenly). Separately, a failure clock runs: on average every 60 minutes (exponential) the machine goes down, and a repair takes 4 ± 1 minutes. While it's down no new job can start; a job already on the machine is allowed to finish. The failure clock keeps running whether the machine is busy or not. The model runs for 2,400 minutes (five 8-hour days).

Find these lines in the model:

Line in the model What it means
run_length = 2400 the run length, in minutes
iat = rv_uniform(Arrivals, 7.0, 13.0) a job every 7 to 13 minutes
rv_uniform(Service, 6.0, 10.0) 6 to 10 minutes of work
rv_expo(Failures, 60.0) time to the next failure, mean 60 minutes
rv_uniform(Repairs, 3.0, 5.0) a repair takes 3 to 5 minutes
served, failures, waited, busy, down jobs finished, breakdowns, total minutes jobs waited, minutes of work, minutes under repair

Measures

Tick Show final values and set Runs to 5. For each run:

Average each over the five runs.

Before you run

Q1. With failures every 60 minutes on average and repairs of 4, what share of the time should the machine be available? How many breakdowns should happen in 2,400 minutes? What share of the time should it be working on jobs?

Tasks

Keep Seed at 1 and Runs at 5. Each task starts from the original model.

  1. As written. Run and record the four measures.
  2. Slower repairs. Change rv_uniform(Repairs, 3.0, 5.0) to rv_uniform(Repairs, 6.0, 10.0) (8 ± 2 minutes). Work out the new availability first, then run.
  3. Often and short. Change rv_expo(Failures, 60.0) to rv_expo(Failures, 30.0) and the repair line to rv_uniform(Repairs, 1.5, 2.5). Twice as many breakdowns, half as long. Run.
  4. Rare and long. Change the failure line to rv_expo(Failures, 120.0) and the repair line to rv_uniform(Repairs, 6.0, 10.0). Half as many breakdowns, twice as long. Run.
  5. A long run. Back to the original, change run_length = 2400 to run_length = 240000. Run and compare with Q1.
  6. If you have runs left: faster repairs, rv_uniform(Repairs, 1.5, 2.5) with failures at 60.

Questions

Q2. Compare task 5 with your answers to Q1. Then compare the five-day runs in task 1: how far off is the breakdown count, and why?

Q3. Tasks 1, 3 and 4 have the same availability on paper. Is it the same in your runs? Is the mean wait the same? Put the three in order of mean wait and explain the order.

Q4. A supplier offers a repair kit that halves repair time but makes failures twice as frequent. Using your results, should the plant take it? What would you want to know before deciding?

Q5. served is the same in every task. Why don't breakdowns reduce how many jobs get finished here, and when would they?


The answer key is shown to the course's instructor when signed in.